Skip to Content

ProdataKey, Altronix join forces to secure office building in Utah

ProdataKey, Altronix join forces to secure office building in Utah

DRAPER, Utah, and BROOKLYN, N.Y.—ProdataKey (PDK), manufacturer of the leading access-control platform built for mobile, and Altronix, the recognized leader in power and data transmission products for the professional security industry, announced that their integrated solution has been deployed to secure an office tower in West Valley City, Utah.

Summit Technology, an IT solutions provider headquartered in Salt Lake City, installed the building-wide solution at Fairbourne Office Tower at the behest of its client, Wasatch Commercial Management (WCM). Fairbourne Office Tower is a nine-story property with an adjacent parking structure located within Fairbourne Station, a new 40-acre, mixed-use development.

The PDK-Altronix solution was designed to meet the property’s immediate security requirements, along with the ability to scale up quickly and easily as needed. The initial installation includes approximately 122 PDK devices securing the lobby, elevators, electrical and storage closets, stairwells, and occupied office space. All readers throughout the building are PDK’s Bluetooth-compatible devices with touch-free capability, Touch io.

A building-wide, high-speed fiber infrastructure, installed by Summit Technology, stands ready to support future controlled access points that will be needed as additional tenants move in. The building is currently occupied by a reduced on-site workforce and contains several vacant floors and office suites due to the pandemic.

Hardware installation was simplified thanks to Altronix Trove enclosures with integrated power. The Altronix units consolidate up to three multi-door controllers and a power supply within a single housing, thereby keeping Fairbourne Tower’s electrical rooms neater and more organized. The Trove enclosures can hold either a 12-volt or 24-volt power supply, which freed Summit Technology to run power over much longer distances using half the wire gauge at 24 volts.

PDK’s unique, mobile-first platform further simplified installation by empowering Summit Technologies’ technicians to use their own phones to test and configure the system’s devices.

The completed PDK-Altronix system provides WCM’s property manager, Joanne Marshall, with highly flexible, easy-to-use tools to manage the building’s access schedules and user credentials.

“Because Pdk io is on the cloud, I have access to it after hours from wherever I am,” she said. “If someone gets locked out, they give me a call and I can remotely let them in.”

Marshall also looks forward to leveraging PDK’s partitioning feature, which allows the HR teams of new tenants to assign users and manage their employees' access privileges. Workers will be able to use the same credential for the building’s main doors, the parking garage, and their suite.

Val Reynolds, Summit Technology’s vice president of Infrastructure and ISP, noted, “Right now, we’ve deployed a solution that’s just a fragment of what we can ultimately build out for the entire complex.”

As tenants move in, Summit Technology can add controlled access points at any time without interfering with the system’s operation. PDK’s “edge-style” system makes installation much easier and less disruptive; as soon as readers are installed and configured, new doors appear within Marshall’s Pdk io app, and she can assign them to a partition.

Evan Tree, PDK’s President and CEO, added, “Being chosen to secure the Fairbourne Office Tower demonstrates the relevance our mobile-first, touch-free access control solution has to the commercial real-estate sector. As workers return to the office, PDK offers the touch-free experience employees will demand along with the management features and scalability valued by property owners and management teams.”

“The combination of our Trove power distribution and its integration with PDK access control in a single solution was the ideal choice when designing security for the Fairbourne Office Tower project,” said Alan Forman, President, Altronix Corp. “Trove simplifies system design and deployment which results in a win-win solution for both Summit Technology and WCM.”

A full case study of the Fairbourne Office Tower installation is available on PDK’s website, at https://bi.ly/pdkFairbournePressRelease.

Comments

To comment on this post, please log in to your account or set up an account now.